Rackspace will be performing emergency maintenance on the host hardware for servers Oak, Balsa, Maple, and Walnut:
- Monday, March 8 at 1am, PST (i.e. late Sunday night)
- Anticipated downtime: 30-60 minutes
The RAID controller battery needs to be replaced, and we'll be taking the opportunity to install additional RAM in these severs to help improve performance during heavy load. Affected services during this time include all shared hosting accounts, email (pop, imap, smtp, mailing lists, and webmail), subversion, and trac instances. After the maintenance is complete all services will be back to normal.
Update—01:19 PST: Hardware upgrades are complete, all servers and up and running. Thanks to Rackspace for the quick turnaround!
Comments